Built in 1890 and rebuilt twice since then, the old bridge over the River Wey carries around four thousand cars a day. Having examined the structure last spring, the council's engineers found serious cracks in two of the supports. Their report, sent to the council in March, recommended closing one lane immediately. Worried about the cost of repairs, the council has not yet discussed the report. Residents living near the bridge say that lorries weighing more than ten tonnes still use it every day, ignoring the signs placed at both ends. "Standing on the pavement, you can feel the whole bridge shake," says Ann Morris, whose house is fifty metres from the river. A group calling itself Save Our Bridge has now written to the mayor. Asked about the delay, a council spokesperson said that a decision would be taken by the end of the summer. Not having seen the full report, local businesses fear that the bridge could be closed completely, forcing drivers to make a twenty-minute detour through the town centre. Having studied similar cases in other towns, experts believe that a full repair would take at least a year. Until then, the bridge, used by thousands of people every day, remains open, and nobody seems to know for how long.
B2 #15 · 간결하게 말하기
글을 이해하셨나요?
각 질문에 대해 하나의 답을 선택하세요.