Megawatts Nobody Was Using

PDF letöltése

When a company called Northfold proposed to build a data centre on the site of a derelict carpet factory, the council of the small market town concerned could scarcely believe its luck. Flora Donnelly, who led the council at the time, spoke of sixty permanent jobs and of a town that would at last have a stake in the modern economy. The vote in favour was unanimous. Four years on, the centre employs thirty-four people, and the town has discovered that it gave away something it had not known it possessed.

The discovery came last winter, when a local builder, Blake Cooper, applied to connect an estate of four hundred new homes to the electricity network and was told that there would be no room for them at the substation for at least six years. His wife, Nina, who runs a bakery in the high street, received much the same answer when she asked for a heavier supply to run electric ovens. Neither had imagined that electricity was a thing a town could run short of.

It is worth being precise about why a single building should have such an effect. A data centre is, in essence, a warehouse of computers that never switch off, and roughly a third of the power it takes goes not on computing at all but on carrying away the heat the machines produce. Whereas a household's demand rises in the evening and all but vanishes at night, a data centre's is nearly flat. The Northfold site draws about 48 megawatts around the clock; every home in the town together, at the busiest moment of a January evening, draws about 30.

Yet consumption, considerable as it is, turns out not to be the heart of the matter. Anika Webb, an energy analyst from Plymouth whom the council eventually hired to explain its predicament, found that Northfold had reserved 80 megawatts at the substation, far more than it has ever used, as an allowance for future expansion. A network operator must treat reserved capacity as though it were already flowing. The town's supply, in other words, was strained less by the electricity the centre burned than by the electricity it might one day want.

The pattern deserves wider notice, since planning committees are generally shown figures for jobs and rates, not for grid connections, and few councillors would know what to ask. Ms Webb's report recommended that any future applicant be required to state its reserved capacity alongside its expected use.

Some relief has since been negotiated. Northfold has agreed to give up 15 megawatts of its reservation, enough for Mr Cooper's estate to be connected within two years, and to pipe its surplus heat to the public swimming pool. Mrs Cooper is still waiting for her ovens. Mrs Donnelly, who lost her seat in May, maintains that the decision was right on the evidence the council had. That may well be true, which is precisely the difficulty.

Megértetted a szöveget?

Válassz egy választ minden kérdésre.

01Which kind of building stood on the site before the data centre?
02How many people does the data centre employ today?
03Who asked for a heavier electricity supply in order to run electric ovens?
04What capacity had Northfold reserved at the substation?
05Where has Northfold agreed to send its surplus heat?