In March I bought my first flat, on the second floor of an old building in Swansea. I had very little money left, so I decided to redecorate it alone. My friend Joe offered to help, but I wanted to learn. It has taken me four months, and here is what I now know.
Lesson one: preparing takes longer than painting. I spent three days filling holes and washing walls in the living room. The painting itself took one afternoon.
Lesson two: cheap tools are expensive. My first brushes lost their hairs in the wet paint, and I had to buy better ones anyway.
Lesson three is the one I learned in the bathroom. One Sunday I was changing the old taps on the basin. I had watched a video, and it looked simple. I turned off a small tap under the basin, but it was the wrong one. When I took the old tap off, water shot up to the ceiling, and I couldn't stop it.
A few minutes later, somebody knocked. It was Mo Nowak from the flat below, and water was coming through the ceiling of his hall. I was expecting him to shout. Instead, he walked straight to a cupboard by my front door and turned off the water for the whole flat. I hadn't even known the tap was there.
I paid a painter to repair Mo's ceiling, and I took a lemon cake downstairs to say sorry. His wife Wendy laughed and lent me their ladder for the bedroom.
The next day a plumber called Callum fitted the new taps in twenty minutes. So here is lesson four: if a job involves water, I'll pay a professional. And find your main tap today, before you need it.